Where did you know from about InjGeo
 

“GeoEngineering”

“GeoEngineering” is a professional scientific and engineering mag intended for oil and gas professionals.

::read more::

PDF Print E-mail

Main clients of SRIDS JCSC “InjGeo” are the leading oil, gas and engineering companies of Russian Federation, such as:

Main projects with participation of JCSC “SRIDS “InjGeo”

Main oil–pipelines:

  • Oil-pipeline system “East Siberia – Pacific Ocean” (length 811 km).
  • Extension of oil-pipeline system “East Siberia – Pacific Ocean” (length 464 km).
  • “East Siberia – Pacific Ocean” pipeline system, section of Oil pipeline station “Skovorodino” – Spetsmornefteport “Kozmino” (ESPO-II). Expansion of Spetsmornefteport “Kozmino” upto 30 mln T/year.
  • “East Siberia – Pacific Ocean” pipeline system. Section of Oil pipeline station “Skovorodino” – Spetsmornefteport “Kozmino” (ESPO-II). PPN Spetsmornefteport “Kozmino”.
  • Baltic pipeline system - 2
  • Eastern Siberia - Pacific Ocean- Komsomolskiy oil pump station oil pipeline branch
  • Maintenance of carrying capacity of OAO “Transneft” oil main pipeline to provide 70 million tons to Primorsk port.
  • Oil-pipeline system Hariaga-Indiga (length 395 km).
  • Reconstruction and extension of the oil-pipeline Yaroslavl – Kirishi- Primorsk, Almetjevsk-Gorki-2, Gorki – Koromislovo.
  • Reconstruction of the main oil-pipelines Baku-Tikhoretsk, Tikhoretsk - Tuapse, Tikhoretsk-Novorossiysk, Malgobek-Tikhoretsk, Grozniy-Baku, Khadizhensk-Krasnodar, Krimsk-Krasnodar.
  • Construction of the manufacturing tunnel for the oil-pipeline over the Caucasian ridge, area of Novorossiysk (Northern Caucus).
  • Нефтепровод для транспортировки Российской нефти в страны Азиатско-Тихоокеанского региона (участок протяженностью 500 км по территории Еврейской автономной области и Хабаровского края, Дальний Восток).


Main gas-pipelines:

  • Gas pipeline “Russia-Turkey”, mountain area (the Northern Caucasus).
  • Tunnel for gas pipeline “Russia-Turkey” at the Northern Caucasus (“Khrebet Kobila” and “Khrebet Bezimyanniy”).
  • Gas pipeline Dzhubga-Lazarevskoye-Sochi.
  • Gas pipeline “Tyumen region northern territories – Torzhok” (the North of the European part of Russia).
  • Northern-European gas pipeline.
  • Gas-pipeline Vidyaevo-Volkhov.
  • Gas pipeline “Sakhalin - Khabarovsk - Vladivostok – Korea border“.
  • Main gas pipeline “Akhangaran – Pungan”.
  • "South Stream" gas pipeline.


Pipeline waterway crossovers:

  • Main oil-pipeline sub-water crossover – Klin through Volga river.
  • Main oil-pipeline sub-water crossover – Polotsk through Volga river.
  • Main oil-pipeline sub-water crossover – Gorkiy – Yaroslavl-2 through Oka river.
  • Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Angara river.
  • Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Olekma river.
  • Main oil-pipeline sub-water crossover – Tikhoretsk – Tuapse, Belaya river.

Offshore oil terminals:

  • Tank farm "Sheskharis" (Novorossiysk).
  • Tank farm "Zarechje" (Tuapse).
  • Техническое перевооружение ПНБ «Заречье». СИКН № 464.
  • Facilities of Novorossiysk oil port terminal No.5. (Novorossiysk).
  • Marine transshipment oil terminal "Perevoznaya", productivity - 80 million tons per year.
  • Reconstruction of Novorossiysk marine commercial sea port.
  • Спецморнефтепорт «Козьмино».
  • Порт Усть-Луга.


Oil transfer tank farms:

  • Oil transfer station "Kavkazskaya" (Krasnodar region).
  • Reconstruction of loading/unloading racks of "Grushovaya" tank farm to provide a total loading capacity of 9mln. tons of oil per year.
  • Crude oil rail loading in the vicinity of the railroad station Balkanka, connecting to oil pipeline system of Oil Transfer Station "Gryazovets".
  • 200 Km³ tank yard extension at "Krymskaya" control point.
  • 200 Km³ auxiliary tank yard at “Grushovaya” tank farm.
  • Receipt, storing and transfer gas condensate stabilized at "Grushovaya" and "Sheskharis" transfer tank farm.
  • "Perevoznaya" tank farm.
  • "Tayshet" oil transfer station.
  • "Skovorodino" oil transfer station.
  • Reconstruction of Pes oil transfer station.
  • CPC extension (development of detail documentation of marine terminal tank farm).
  • «Кozmino» tank farm.


Refinery facilities:

  • Primorskiy refinery
  • Yuzhniy refinery

Handover Statements:

  • Main oil transfer station “Kumkol” (Train I). Revamping and upgrading pipelines of East branch of АО "Kaztransoil".
  • Construction of oil transfer station "Krasnodarskiy".
  • Oil receiving station “Kozmino”.

Общегражданские объекты и объекты подготовки к Олимпиаде "Сочи-2014":

  • M-27 "Dzhubga-Sochi" motor road.
  • Relocation of "Tuapse-Adler" rail road.
  • "Adler-Aibga-Krasnaya Poliana" motor road.
  • Imeritinskaya depression motor roads.
  • Curling ice rink (3 thousand seats), Imeritinskoy depression (including survey and design activities and intrasite networks).
  • Development of seismic route classification system and control points for collection of seismic information.
  • International conference center for APEC-2012 on Russkiy island in Japan Sea.
  • Construction of 15 floor extension to CJSC "SRIDS "InjGeo"" main office building.
  • Office building for Verkhnevolskiy main pipelines.
  • Office building for Lensk regional oil pipeline management.
  • Office building for Nerungry regional oil pipeline management.

Магистральные насосные станции:

  • Reconstruction of main transfer stations “Tikhoretskaya”, “Rodionovskaya”, “Krimskaya”, “Psekupskaya”, “Novovelichkovskaya”, “Rodionovskaya” and others.
  • Oil transfer tank farm “Skovorodino”.

Telemechanics of main oil-pipeline:

  • Baku – Tikhoretsk.
  • Malgobek- Tikhoretsk.
  • Khadizhensk – Krasnodar.
  • Krimsk – Krasnodar.

Main oil-pipelines route high voltage lines:

  • Altemievsk – Kuibishev.
  • Kiengol – Naberezhniye Chelni.
  • Tikhoretsk – Tuapse.
  • Baku – Tikhoretsk.
  • Malgobek- Tikhoretsk.
  • Khadizhensk – Krasnodar.
  • Krimsk – Krasnodar.

Boiler plants:

  • Boiler plant reconstruction at the oil tank farm “Sheskharis”.
  • Boilers feed system reconstruction at the boiler plant “Psekupskaya”.
  • Boiler plant reconstruction at oil tank farm “Grushovaya”.
 

Sochi Olympic projects

In Krasnodar region we are presently performing a number of projects not only of oil and gas profile but of general civil as well. This pertains to survey and design of “Motor road M-27 Dzhubga-Sochi” being the most complicated transport project involving lots of bridges, overpasses and tunnels, rebuilding “Moving R/R at Tuapse-Adler section”, Sochi Olympic projects including survey and design of “Adler-Aibga-Krasnaya poliana” motor road, development of “Krasnaya poliana health resort, survey and design of “Olympic village” and many others.

::read more::

Main page Contacts Search Contacts Search