Maintenance of carrying capacity of OAO “Transneft” oil main pipeline to provide 70 million tons to Primorsk port.
Oil-pipeline system Hariaga-Indiga (length 395 km).
Reconstruction and extension of the oil-pipeline Yaroslavl – Kirishi- Primorsk, Almetjevsk-Gorki-2, Gorki – Koromislovo.
Reconstruction of the main oil-pipelines Baku-Tikhoretsk, Tikhoretsk - Tuapse, Tikhoretsk-Novorossiysk, Malgobek-Tikhoretsk, Grozniy-Baku, Khadizhensk-Krasnodar, Krimsk-Krasnodar.
Construction of the manufacturing tunnel for the oil-pipeline over the Caucasian ridge, area of Novorossiysk (Northern Caucus).
Нефтепровод для транспортировки Российской нефти в страны Азиатско-Тихоокеанского региона (участок протяженностью 500 км по территории Еврейской автономной области и Хабаровского края, Дальний Восток).
Main gas-pipelines:
Gas pipeline “Russia-Turkey”, mountain area (the Northern Caucasus).
Tunnel for gas pipeline “Russia-Turkey” at the Northern Caucasus (“Khrebet Kobila” and “Khrebet Bezimyanniy”).
Gas pipeline Dzhubga-Lazarevskoye-Sochi.
Gas pipeline “Tyumen region northern territories – Torzhok” (the North of the European part of Russia).
Northern-European gas pipeline.
Gas-pipeline Vidyaevo-Volkhov.
Gas pipeline “Sakhalin - Khabarovsk - Vladivostok – Korea border“.
Main gas pipeline “Akhangaran – Pungan”.
"South Stream" gas pipeline.
Pipeline waterway crossovers:
Main oil-pipeline sub-water crossover – Klin through Volga river.
Main oil-pipeline sub-water crossover – Polotsk through Volga river.
Main oil-pipeline sub-water crossover – Gorkiy – Yaroslavl-2 through Oka river.
Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Angara river.
Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Olekma river.
Main oil-pipeline sub-water crossover – Tikhoretsk – Tuapse, Belaya river.
Facilities of Novorossiysk oil port terminal No.5. (Novorossiysk).
Marine transshipment oil terminal "Perevoznaya", productivity - 80 million tons per year.
Reconstruction of Novorossiysk marine commercial sea port.
Спецморнефтепорт «Козьмино».
Порт Усть-Луга.
Oil transfer tank farms:
Oil transfer station "Kavkazskaya" (Krasnodar region).
Reconstruction of loading/unloading racks of "Grushovaya" tank farm to provide a total loading capacity of 9mln. tons of oil per year.
Crude oil rail loading in the vicinity of the railroad station Balkanka, connecting to oil pipeline system of Oil Transfer Station "Gryazovets".
200 Km³ tank yard extension at "Krymskaya" control point.
200 Km³ auxiliary tank yard at “Grushovaya” tank farm.
Receipt, storing and transfer gas condensate stabilized at "Grushovaya" and "Sheskharis" transfer tank farm.
"Perevoznaya" tank farm.
"Tayshet" oil transfer station.
"Skovorodino" oil transfer station.
Reconstruction of Pes oil transfer station.
CPC extension (development of detail documentation of marine terminal tank farm).
«Кozmino» tank farm.
Refinery facilities:
Primorskiy refinery
Yuzhniy refinery
Handover Statements:
Main oil transfer station “Kumkol” (Train I). Revamping and upgrading pipelines of East branch of АО "Kaztransoil".
Construction of oil transfer station "Krasnodarskiy".
Oil receiving station “Kozmino”.
Общегражданские объекты и объекты подготовки к Олимпиаде "Сочи-2014":
M-27 "Dzhubga-Sochi" motor road.
Relocation of "Tuapse-Adler" rail road.
"Adler-Aibga-Krasnaya Poliana" motor road.
Imeritinskaya depression motor roads.
Curling ice rink (3 thousand seats), Imeritinskoy depression (including survey and design activities and intrasite networks).
Development of seismic route classification system and control points for collection of seismic information.
International conference center for APEC-2012 on Russkiy island in Japan Sea.
Construction of 15 floor extension to CJSC "SRIDS "InjGeo"" main office building.
Office building for Verkhnevolskiy main pipelines.
Office building for Lensk regional oil pipeline management.
Office building for Nerungry regional oil pipeline management.
Магистральные насосные станции:
Reconstruction of main transfer stations “Tikhoretskaya”, “Rodionovskaya”, “Krimskaya”, “Psekupskaya”, “Novovelichkovskaya”, “Rodionovskaya” and others.
Oil transfer tank farm “Skovorodino”.
Telemechanics of main oil-pipeline:
Baku – Tikhoretsk.
Malgobek- Tikhoretsk.
Khadizhensk – Krasnodar.
Krimsk – Krasnodar.
Main oil-pipelines route high voltage lines:
Altemievsk – Kuibishev.
Kiengol – Naberezhniye Chelni.
Tikhoretsk – Tuapse.
Baku – Tikhoretsk.
Malgobek- Tikhoretsk.
Khadizhensk – Krasnodar.
Krimsk – Krasnodar.
Boiler plants:
Boiler plant reconstruction at the oil tank farm “Sheskharis”.
Boilers feed system reconstruction at the boiler plant “Psekupskaya”.
Boiler plant reconstruction at oil tank farm “Grushovaya”.
Sochi Olympic projects
In Krasnodar region we are presently performing a number of projects not only of oil and gas profile but of general civil as well. This pertains to survey and design of “Motor road M-27 Dzhubga-Sochi” being the most complicated transport project involving lots of bridges, overpasses and tunnels, rebuilding “Moving R/R at Tuapse-Adler section”, Sochi Olympic projects including survey and design of “Adler-Aibga-Krasnaya poliana” motor road, development of “Krasnaya poliana health resort, survey and design of “Olympic village” and many others.