“GeoEngineering”
“GeoEngineering” is a professional scientific and engineering mag intended for oil and gas professionals.
::read more::
|
|
Main clients of SRIDS JCSC “InjGeo” are the leading oil, gas and engineering companies of Russian Federation, such as:
- OAO «AK Transneft»
- OAO «Gazprom»
- OAO "NK-Rosneft",
- GK "Olimpstroy",
- ZAO "Tamanneftegaz",
- OAO "Giprotruboprovod",
- OAO "Giprospetsgaz",
- OAO «Giprogazcentr»,
- ILF Consulting Engineers,
- AK «Saipem» S.P.A.,
- KATRAN-K,
- АО «KazTransOil»,
- John Brown E&C Ltd,
- ZEROMAX and others.
Main projects with participation of JCSC “SRIDS “InjGeo”
Main oil–pipelines:
- Oil-pipeline system “East Siberia – Pacific Ocean” (length 811 km).
- Extension of oil-pipeline system “East Siberia – Pacific Ocean” (length 464 km).

- “East Siberia – Pacific Ocean” pipeline system, section of Oil pipeline station “Skovorodino” – Spetsmornefteport “Kozmino” (ESPO-II). Expansion of Spetsmornefteport “Kozmino” upto 30 mln T/year.
- “East Siberia – Pacific Ocean” pipeline system. Section of Oil pipeline station “Skovorodino” – Spetsmornefteport “Kozmino” (ESPO-II). PPN Spetsmornefteport “Kozmino”.
- Baltic pipeline system - 2
- Eastern Siberia - Pacific Ocean- Komsomolskiy oil pump station oil pipeline branch
- Maintenance of carrying capacity of OAO “Transneft” oil main pipeline to provide 70 million tons to Primorsk port.
- Oil-pipeline system Hariaga-Indiga (length 395 km).

- Reconstruction and extension of the oil-pipeline Yaroslavl – Kirishi- Primorsk, Almetjevsk-Gorki-2, Gorki – Koromislovo.

- Reconstruction of the main oil-pipelines Baku-Tikhoretsk, Tikhoretsk - Tuapse, Tikhoretsk-Novorossiysk, Malgobek-Tikhoretsk, Grozniy-Baku, Khadizhensk-Krasnodar, Krimsk-Krasnodar.

- Construction of the manufacturing tunnel for the oil-pipeline over the Caucasian ridge, area of Novorossiysk (Northern Caucus).
- Pipeline for transportation of Russian oil to APAC countries ( 500 km section thru Jewish Autonomous Region and Khabarovsk Territory, Far East)
 |
 |
Main gas-pipelines:
- Gas pipeline “Russia-Turkey”, mountain area (the Northern Caucasus).

- Tunnel for gas pipeline “Russia-Turkey” at the Northern Caucasus (“Khrebet Kobila” and “Khrebet Bezimyanniy”).
- Gas pipeline Dzhubga-Lazarevskoye-Sochi.
- Gas pipeline “Tyumen region northern territories – Torzhok” (the North of the European part of Russia).

- Northern-European gas pipeline.
- Gas-pipeline Vidyaevo-Volkhov.
- Gas pipeline “Sakhalin - Khabarovsk - Vladivostok – Korea border“.
- Main gas pipeline “Akhangaran – Pungan”.
- "South Stream" gas pipeline.
 |
 |
Pipeline waterway crossovers:
- Main oil-pipeline sub-water crossover – Klin through Volga river.
- Main oil-pipeline sub-water crossover – Polotsk through Volga river.
- Main oil-pipeline sub-water crossover – Gorkiy – Yaroslavl-2 through Oka river.

- Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Angara river.
- Main oil-pipeline sub-water crossover (Eastern Siberia – Pacific Ocean) through Olekma river.
- Main oil-pipeline sub-water crossover – Tikhoretsk – Tuapse, Belaya river.
Offshore oil terminals:
- Tank farm "Sheskharis" (Novorossiysk).
- Tank farm "Zarechje" (Tuapse).
- Retrofitting and upgrading of “Zarechie” transfer pump station. Crude oil custody transfer metering system № 464
- Facilities of Novorossiysk oil port terminal No.5. (Novorossiysk).
- Marine transshipment oil terminal "Perevoznaya", productivity - 80 million tons per year.
- Reconstruction of Novorossiysk marine commercial sea port.
- Spetsmorneftport “Kozmino”.
- Ust-Luga port.
 |
 |
Oil transfer tank farms:
- Oil transfer station "Kavkazskaya" (Krasnodar region).
- Reconstruction of loading/unloading racks of "Grushovaya" tank farm to provide a total loading capacity of 9mln. tons of oil per year.
- Crude oil rail loading in the vicinity of the railroad station Balkanka, connecting to oil pipeline system of Oil Transfer Station "Gryazovets".
- 200 Km³ tank yard extension at "Krymskaya" control point.
- 200 Km³ auxiliary tank yard at “Grushovaya” tank farm.
- Receipt, storing and transfer gas condensate stabilized at "Grushovaya" and "Sheskharis" transfer tank farm.
- "Perevoznaya" tank farm.
- "Tayshet" oil transfer station.
- "Skovorodino" oil transfer station.
- Reconstruction of Pes oil transfer station.
- CPC extension (development of detail documentation of marine terminal tank farm).
- «Кozmino» tank farm.
 |
 |
Refinery facilities:
- Primorskiy refinery
- Yuzhniy refinery
Handover Statements:
- Main oil transfer station “Kumkol” (Train I).
Revamping and upgrading pipelines of East branch of АО "Kaztransoil".
- Construction of oil transfer station "Krasnodarskiy".
- Oil receiving station “Kozmino”.
Civil buildings and facilities destined to support “Sochi 2014” Olympic games preparation works:
- M-27 "Dzhubga-Sochi" motor road.
- Relocation of "Tuapse-Adler" rail road.
- "Adler-Aibga-Krasnaya Poliana" motor road.
- Imeritinskaya depression motor roads.
- Curling ice rink (3 thousand seats), Imeritinskoy depression (including survey and design activities and intrasite networks).
- Development of seismic route classification system and control points for collection of seismic information.
- International conference center for APEC-2012 on Russkiy island in Japan Sea.
- Construction of 15 floor extension to CJSC "SRIDS "InjGeo"" main office building.
- Office building for Verkhnevolskiy main pipelines.
- Office building for Lensk regional oil pipeline management.
- Office building for Nerungry regional oil pipeline management.
Main pump stations:
- Reconstruction of main transfer stations “Tikhoretskaya”, “Rodionovskaya”, “Krimskaya”, “Psekupskaya”, “Novovelichkovskaya”, “Rodionovskaya” and others.
- Oil transfer tank farm “Skovorodino”.
Telemechanics of main oil-pipeline:
- Baku – Tikhoretsk.
- Malgobek- Tikhoretsk.
- Khadizhensk – Krasnodar.
- Krimsk – Krasnodar.
Main oil-pipelines route high voltage lines:
- Altemievsk – Kuibishev.
- Kiengol – Naberezhniye Chelni.
- Tikhoretsk – Tuapse.
- Baku – Tikhoretsk.
- Malgobek- Tikhoretsk.
- Khadizhensk – Krasnodar.
- Krimsk – Krasnodar.
Boiler plants:
- Boiler plant reconstruction at the oil tank farm “Sheskharis”.
- Boilers feed system reconstruction at the boiler plant “Psekupskaya”.
- Boiler plant reconstruction at oil tank farm “Grushovaya”.
|
|
|
Sochi Olympic projects
In Krasnodar region we are presently performing a number of projects not only of oil and gas profile but of general civil as well. This pertains to survey and design of “Motor road M-27 Dzhubga-Sochi” being the most complicated transport project involving lots of bridges, overpasses and tunnels, rebuilding “Moving R/R at Tuapse-Adler section”, Sochi Olympic projects including survey and design of “Adler-Aibga-Krasnaya poliana” motor road, development of “Krasnaya poliana health resort, survey and design of “Olympic village” and many others.
::read more::
|